Skilled Labor SubHub
DivisionFramingSubHub™
Framing crew on an active job site
TR-01FramingSubHub™

Wood framing crews, deck to dry-in

Production framing crews that hold layout, hit stack schedules, and dry a house in on the day the builder said. Lead carpenters, wall panel crews, and truss setters — all rated on completed units.

Framing crews
1,240
Units framed / yr
38K
Avg. dry-in
6 days
01Client solutions

What FramingSubHub delivers

F-01

Production framing

Full deck-to-dry-in crews on repeatable plan sets across a subdivision.

F-02

Wall panel setting

Panelized and truss set crews with crane coordination on the same dispatch.

F-03

Punch and correction

Two- and three-man teams that clear framing punch before inspection.

02Recruiting

Get on the framing bench

One profile, one account, every division. Verify your credentials once and get dispatched by ATLAS™ to framing work near you — with pay, hours, and travel visible before you accept.

Apply to FramingSubHub™
03Fast Five™ training
  1. 01Layout and plate reading
  2. 02Load path and shear
  3. 03Stair and roof cuts
  4. 04Fall protection
  5. 05Inspection-ready punch
04Field testimonial

They put four framing crews on a 96-unit phase in nine days. We have never had a dry-in schedule hold like that.

Dale RivasVP Construction, Meridian Homes
05Case study

96-unit subdivision, Central Texas

Crews deployed
4
Schedule gain
11 days
Rework rate
0.6%

ATLAS™ matched framing crews by unit type, sequenced dry-in against the truss delivery window, and reported live headcount to the builder every morning.

06Trade FAQ

Do crews bring their own tools?

Yes. Every framing crew mobilizes with nailers, saws, layout, and fall protection.

How fast can you mobilize?

Most metros deploy a first crew within 72 hours of a signed scope.

07Trade news
  • 2026.07Panelized framing demand up 19% across Sun Belt starts
  • 2026.06FramingSubHub adds truss-set certification to Fast Five™

Community · Framing WhatsApp channel · framingsubhub.com