
Wood framing crews, deck to dry-in
Production framing crews that hold layout, hit stack schedules, and dry a house in on the day the builder said. Lead carpenters, wall panel crews, and truss setters — all rated on completed units.
- Framing crews
- 1,240
- Units framed / yr
- 38K
- Avg. dry-in
- 6 days
What FramingSubHub delivers
Production framing
Full deck-to-dry-in crews on repeatable plan sets across a subdivision.
Wall panel setting
Panelized and truss set crews with crane coordination on the same dispatch.
Punch and correction
Two- and three-man teams that clear framing punch before inspection.
Get on the framing bench
One profile, one account, every division. Verify your credentials once and get dispatched by ATLAS™ to framing work near you — with pay, hours, and travel visible before you accept.
Apply to FramingSubHub™- 01Layout and plate reading
- 02Load path and shear
- 03Stair and roof cuts
- 04Fall protection
- 05Inspection-ready punch
“They put four framing crews on a 96-unit phase in nine days. We have never had a dry-in schedule hold like that.”
96-unit subdivision, Central Texas
- Crews deployed
- 4
- Schedule gain
- 11 days
- Rework rate
- 0.6%
ATLAS™ matched framing crews by unit type, sequenced dry-in against the truss delivery window, and reported live headcount to the builder every morning.
Do crews bring their own tools?
Yes. Every framing crew mobilizes with nailers, saws, layout, and fall protection.
How fast can you mobilize?
Most metros deploy a first crew within 72 hours of a signed scope.
- 2026.07Panelized framing demand up 19% across Sun Belt starts
- 2026.06FramingSubHub adds truss-set certification to Fast Five™
Community · Framing WhatsApp channel · framingsubhub.com